| Welcome to the East Dowling Road Extension & Reconstruction web site | |||||||||||||||||||||
|
PROJECT STATUS: Construction on East Dowling Road has
been completed and the roadway was opened to traffic in September 2010. ADOT&PF is proposing to extend Dowling Road from Lake Otis Parkway to the Abbott Loop Road extension that is currently under construction. ADOT&PF has hired DOWL Engineers as their consultant to design the road extension. The project would consist of reconstructing Dowling Road from Lake Otis Parkway east to Norm Drive and constructing a new portion of Dowling Road from Norm Drive to Abbott Loop Road, a total distance of approximately one mile. |
|||||||||||||||||||||
![]() |
|||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||
| Related Links | |||||||||||||||||||||
Questions?
Please contact the Webdesigner.
February 2006 |
|||||||||||||||||||||